Sunday 12 July 2015

Measurement 2 QSB 60204

This subject covers the principles, purpose and function of Standard Method of Measurement (SMM2) including measurement principles, descriptions and standard phraseology. It also covers the measurement of brickwork of internal and external walls, timber floors and stud partitions, staircase structure and staircase balustradings; floor, wall, ceiling and staircase finishes including painting. All measurements will be based on the Standard Method of Measurements for Building Works Second Edition by the Royal Institution of Surveyors, Malaysia.

LEARNING OUTCOME
1. Adopt a systematic approach to take-off quantities from drawings for brickworks, stud partitions, staircase
structure, staircase finishes and balustrading, floor, wall and ceiling finishes and precast concrete piling.

2. Distinguish and illustrate differences in writing-up descriptions in accordance to design changes for
brickworks, stud partitions, staircase structure, staircase finishes and balustrading, floor, wall and ceiling
finishes and precast concrete piling.


3. Produce measurement for brickworks, stud partitions, staircase structure, staircase finishes and
balustrading, floor, wall and ceiling finishes and precast concrete piling.


4. Generate a conceptual understanding and the ability to competently carry out the preparation of the Bills of
Quantities for brickworks, stud partitions, staircase structure, staircase finishes and balustrading, floor, wall
and ceiling finishes and precast concrete piling.

 

No comments:

Post a Comment